Friday, March 21, 2014

Spring to Action

I haven't been able to turn my full attention to the rudder build yet (22" of new snow and Mad River Glen was begging to be skied), but I'm starting to gather momentum.  Another 5" last night did not help with motivation for my more liquid pursuits, but now that it's officially spring I think it's time to put the skis away (well, mostly).

A few nights back I epoxied the 2 halves together.  I mixed up a batch of unthickened epoxy and coated both halves and the channels I cut for the drift bolts.  I let that soak in a bit and then mixed up a set 3/8" PEX tubing (waxed with butchers paste) into the channels on one of the halves.  Then I mixed up a slightly thickened batch (Aerosil) and troweled in on with a 1/8" notched spreader.  Carefully I stuck the 2 halves together and screwed it together with sheet rock screws and fender washers.   I pulled the tubing the next morning and then let the whole thing cure for a few days before pulling the sheet rock screws.

Next I set up the saw horses outside and took the belt sander to the trailing edge to get a bit of a foil shape. I'm really not performance oriented so I didn't go crazy with the shaping.  If I cared about eeking out every bit of speed I could, I would have gone all NACA on the rudder.  Of course, if speed really mattered to me I probably wouldn't be fixing up a beat up old Alberg.  The nice thing about plywood (especially good marine plywood) is that the plys act as a really nice visual fairing guide when trying to shape something.

Yesterday afternoon I had a bit of time so I bolted on the lower part of the shaft to the rudder and my son and I went over to the boat for a partial test fitting.  I say partial because I didn't fit the top half of the shaft but plan on doing that this weekend.  Yesterday was more of a sanity check to make sure I was on the right track. Fortunately, I was and didn't see any major adjustments in shape that will have to be made.  This weekend's full test fit will show me what final adjustments will need to be made before I glass the whole thing up.






Sunday, March 9, 2014

Channel Cutter

Continuing with the rudder build today I did a test fit of the basic rudder shape on the boat and marked the location of the drift pins on the lower rudder shaft.  Once I had those marked off I laid out guide boards for the router with a 3/8 inch channel bit.  The guides are offset by 2 - 26/32 and it was important to get them correct on both halves of the rudder.  I screwed down the guide board and starting from the middle, cut a channel in each half of the rudder.  The total depth of the rudder determined the length of each channel.  So, I ended up cutting 2 - 5" channels, 1 - 12" channel, and 2 - 16" channels.

Once all the channels were cut, I screwed both halves of the rudder together with temporary screws and cut out the ends of each channel with a 2.5" hole saw.  These holes will form the pockets where the washers and nuts fasten the drift pins.  I ordered those today and hope to see them by the end of next week.






Saturday, March 8, 2014

Ruddery Goodness

I've finally managed to free myself from the grips of winter and got back to work on some of the projects that need to be done.  There's still a lot of snow on the ground and it's too cold to work in the boatshed so I'm confined to the shop, but at least it's warm.

I stopped in at Goosebay sawmill last week and bought a sheet of 18mm Meranti marine plywood for the new rudder build ($155.00).  I went back and forth on whether or not to go traditional with solid mahogany planks or encapsulated plywood.  Ultimately, I chose plywood because I didn't feel comfortable enough with the movements of swollen planks and how to deal with it.  I've tangled with the properties of wet/humid wood on a number of occasions with tables and cabinets I've built, and it is really tricky to get it right.  I figured I didn't want to mess around with something as important as the rudder so I went with plywood which will be dimensionally more stable (especially once encapsulated).  The design will use two pieces of 18mm Meranti epoxied together to make a thickness of just under 1.5".

I had picked up my newly fabricated rudder post back in December and it had been sitting in my shop waiting for action.  Once I had the plywood I ripped it in half (lengthwise) and used the old rudder to trace the shape onto it.  Fortunately the maximum witdth of the old rudder is only 23" or I would have needed two sheets of plywood instead of one.

Using a saber saw, I cut proud of the traced line and then screwed on a piece of plastic laminate to create a fair arc.  I mounted a flush cut bit to the router and used the laminate as a guide to make a perfectly smooth arc along the trailing edge of the first piece of plywood.

On the front edge of the rudder where the propeller aperture is located and the post attaches, I carefully cut along the line and cleaned it up with a rasp to make sure the new rudder post would attach with the proper angle.

When I was satisfied with the shape and fit of the first piece of plywood I screwed it down to the second piece and rough cut it to the basic shape of the first using the saber saw.   I broke out the router and flush cut bit again and cut out a copy of the first.

Now that I had 2 identical copies of the rudder I could focus on setting a cove into leading edge of both pieces so the rudder post can nest into the cove once the 2 pieces are epoxied together.  The router saved the day again; using a 3/4" radius cove bit I cut a cove on each half of the rudder.  I had to shape a guide board for the aperture area for the bit that took a bit of time, but overall the process went smoothly.  I temporarily screwed the pieces together to make sure both the new and the old bottom shaft fit.  It was just about perfect.  Tomorrow, I'll make a test fit on the boat just to make sure the shafts line up properly before I cut the channels for the drift pins that will be sandwiched in the rudder.





Wednesday, February 19, 2014

Fluffing Off






















I wish I could say that I have been busy working in my shop preparing bits and pieces of the boat, but I  haven't picked up a boat tool since early December.  I won't make any excuses even though I feel a tad bit guilty; I do have several projects that could be done in my basement shop (rudder, dorades, cleaning hardware, etc...), but I just needed a break.  
The break started out with general holiday madness that requires family time, shopping, parties, and the like but over the past three weeks we have gotten a snow dumping that I haven't seen in many years and I'm loving it.  I have been hitting all the local areas for downhill as frequently as possible and I've been doing a boatload of backcountry skiing with my light telemark gear.  I have been htiting up all the local trails systems with hills and small mountains and earning my turns by skinning up and then free-heel skiing back down through the forest.  It is absolutely fantastic and the quiet and solitude reminds me of why I ended up in Central New Hampshire in the first place.

I'll be back at the boat work soon enough, but until then you can find me deep in the woods on my skis with a big smile on my face and snow in my beard.


Monday, November 18, 2013

Tapped

The cold has brought all epoxy work on the boat to a halt, but there's still a ton of work to do. Friday, I drove down to see my friend Peter at Buzzards Bay Yacht Services to see what he has been up to and to drop off my old rudder shaft with his machinist to fabricate a new one. He has a bunch of projects in the works and will be really busy over the winter. When I showed up, he and his crew were working on pulling the old teak decks off a Baltic 42 in preparation for new ones. The removal of my teak cockpit sole was still painfully fresh in my mind (which was only about 10 square feet) and I can't imagine doing this job where almost every horizontal surface is covered in teak that needs to be ripped off. Uggh. Anyway, I left fabrication instructions for the new rudder shaft off at the machinist and hope to hear back this upcoming week so I feel like I'm moving forward a bit on that front.

The rest of the weekend went by in a whirlwind of family activities as usual, but I did carve out a few hours on Sunday to start dry mounting the lifeline stanchions. By dry mounting, I mean that I tapped and fitted them but didn't fasten them permanently with butyl tape (the sealant I'll be using for most deck fittings) because I want to get some paint on the underside of the decks before I permanently mount them.  I had recently ordered $100 worth of 2-1/2" Silicon Bronze screws, washers, and nuts and wanted to see them installed.

Bevel with countersink bit
All in all is was pretty straight forward but you have to make sure your tap is going straight down or it will be difficult to mount the backing plate. The first one I lined up the stanchion on the backing plate and pre-tapped the backing plate holes. Unfortunately, when I tapped the holes in the deck, I must have been slightly skewed and the screws didn't match up with the backing plate.

A little trimming here and there allowed me to seat it, but for the rest of the stanchions my procedure went as follows:

  1. Place the stanchion on deck at desired locations.
  2. Tap all 4 holes in deck using stanchion as guide (5/16" bit). 
  3. Chamfer the edge of each hole by overdrilling with a countersink bit to allow for a slight bevel (see bevel photo). This serves to reduce stress related fractures in deck when stanchion is put under load and allows a ring for butyl tape to bed nicely into. 
  4. Tap one hole in backing plate and mount tight on underside of deck, making sure that it is positioned properly. 
  5. Tap remaining 3 holes in backing plate from the deck, using the mounted stanchion as a guide.
  6. Fit bolts in stanchion and add washer and nut.
I still have to paint and remove the old fasteners before I permanently mount the stanchions.


Monday, November 11, 2013

Shiny Objects

With the cold firmly in place and the rudder project stalled until I have a new rudder post fabricated, my hopes for finishing up the cockpit this season are diminishing by the day.  I still have lots to do though and I've turned my attention toward getting some of the deck hardware cleaned up and ready for re-install.  I'm hoping that I can get some of it re-installed even though it is cold since I'm going to be using butyl tape for a lot of the hardware and it can be warmed up with a hairdryer sufficiently to snug the pieces in place.

The stanchions and lifelines have been sitting in a bin for several years waiting for some love and I finally got to them over the past week.  The lifelines are complete junk and I'll need to replace them so I cut them off with an angle grinder to liberate the stanchions.  Next I needed to remove the stainless steel stanchions from the chromed bronze bases.  There is a set screw on each stanchion base that locks the stanchion in place and the first 2 came off without a fight, but the remaining 5 proved to be less willing to part so sprayed them down with PBBlaster and left them overnight which allowed me to free up 3 more.  The final 2 decided that they needed heat to break the set screw out so I hit them with a torch and finally more PBBlaster before setting them aside.

The next day I was able to free the last 2 set screws but the last stanchion decided it didn't want to leave the stanchion base, but I was able to move forward with cleanup on the other 6.  I set up my trusty electrolyzer bucket and battery charger with a steel plate for the anode and dunked each stanchion base one at a time for the cathode. After several hours with the battery charger running the stanchion base came out black, but smooth and free of years of corrosion, dirt, and general nastiness.  I dried them off and hit them with a wire wheel on my drill press for a few minutes to reveal the underlying shiny bronze.  I repeated this for each of the 6 free stanchion bases and got them all pretty again.

Next, I used a 1' x 1' piece of 1/2 inch fiberglass plate (the same type that I am using for the rudder tube junction on the deck here) and cut it up into 9 equally sized pieces to use as backing plates.  Then I hit each one with a belt sander to round the corners and smooth out the rough edges.  Finally I tapped the 5/16" holes for the 2-1/2" silicon bronze bolts I bought to secure the stanchions to the deck.  I still have to deal with the final base that won't give up the stanchion, but I may start mounting the finished ones in the meantime.




Monday, November 4, 2013

The Cold is Here

After what seemed like a reasonably warm autumn, it looks like the cold is here and probably to stay.  As a result I didn't get too much done this weekend, but it did warm up enough on Saturday to allow me to epoxy in the core around the fuel tank fill tube.


Knowing that it would be difficult to work around the existing rubber fill hose that goes to the fuel tank, I spent about 30 minutes lying on my back in the quarter berth yelling at the stupid thing because it just didn't want to come out.  It's only about an 8" length of hose, but the access is poor and it was just 'fused' on.  I eventually gave up trying to get it off in one piece and took a hacksaw blade (a full hacksaw wouldn't fit) and cut it diagonally where it was stuck onto the tank.

Once the tube was off, I cut off a 3/8" piece of fiberglass tubing that I had ordered for the new rudder tube to use as the flange for the fill tube entry.  I have lots of extra tube from the rudder project (I had to order a 5 foot length but only need about 20 inches) and as luck would have it, the fill tube is not quite 2 inches in diameter so the rudder tube (2 inch inner diameter) was a perfect fit.  It will serve as a mounting point for the fill cap and will isolate the core from any water intrusion.

Once I fitted the tube, I cut out enough balsa to fit around the gap I had left in the deck surrounding the fill tube and glued it all up.  Since it was such a small area, I ended up doing both the core and the first layer of biaxial in one shot.

The tiller conversion and new rudder projects are moving along like the temperature; glacially slow (although the glaciers seem to be melting pretty fast these days).  Before I can really move forward to any degree, I need to get the new shaft fabricated. Once that is done I can fit the rudder tube to its final position. The only thing I did was to cut the fiberglass rudder tube down to the final length so that the final position will have the tube extending about 6 inches above the finished deck.

However, I did get more excited about the project when the FedEx truck stopped by Saturday and dropped off the new tiller head assembly from Edson.  It is pretty...